Drawings soon arrived with a link to Google Sketch Up so we could manipulate the drawings at home, see the house from all angles and go inside and visit each room. We went down to Keith's office and talked through various details and options and with the wonders of modern technology, to coin a phrase, he was able to make changes immediately on screen and we could see the finished drawing.
Once the basic design had been completed there was then a hiatus of several months while we waited for the legals to be completed on the purchase of the plot. This was a frustrating time for all concerned, but eventually we able to go ahead with a planning application which completed without any difficulty. The next stage was the Building Warrant application. Keith got an engineer's report on the ground conditions and calculations for the frame structure and the Warrant was obtained without much trouble, other than the BCO asserting his position over some trivial drainage detail.
One odd thing was the sudden appearance of a pond on the drawings. Apparently the Firemaster insisted on a water reservoir for the use of his fire appliances should the worst happen, but later this condition was modified.
No comments:
Post a Comment